Is there a timing window between operations played by Accelerated Diagnostics where paid abilities can be used?
For example, you have a Jackson Howard, a Power Shutdown, and an Accelerated Diagnostics in hand.
- Click 1, install Jackson.
- Click 2, Power Shutdown your entire R&D into Archives.
- Then use Jackson to handpick 3 operations (Interns, something else (A), Accelerated Diagnostics) to go back to R&D.
- Click 3, play Accelerated Diagnostics and play those three operations:
- Interns to install another Jackson.
- Use Jackson #2 to stack 3 more operations (Interns, B, Accelerated Diagnostics) on R&D
- Play A
- Accelerated Diagnostics #2:
- Interns to install final Jackson
- Play B
- Use Jackson #3 to stack 3 more operations (C, D, E)
- Play Accelerated Diagnostics #3:
- C
- D
- E